Commit graph

13 commits

Author SHA1 Message Date
35f33facb3 Bug 14778: Install fixtures for t/Calendar.t
Signed-off-by: Martin Renvoize <martin.renvoize@ptfs-europe.com>

Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Tomas Cohen Arazi <tomascohen@theke.io>
2015-10-23 12:01:18 -03:00
5d256e6b4b Bug 14522: Use Koha::Cache for accessing single_holidays()
this patch adds Koha::Cache functionality to the 'single_holidays' table
it is a performance patch for the problem described in BZ14315, only

 http://bugs.koha-community.org/bugzilla3/show_bug.cgi?id=14315

it replaces slooow DateTime holiday objects with simple Ymd strings (19991230), then stores the strings in an @array using Koha::Cache
it does not attempt to add caching to all holiday tables - just the single_holidays table (at this stage

 on my test (master-cd9a827); nytprof showed a time reduction of the single_holidays() sub - from 61.7s to 587ms

here are some before/after nytprof runs, (really on master-cd9a827, not 3.20)

 http://x1.kohaaloha.com/i/nyt-bz14522-before/home-mason-g-k-3-20-x-Koha-Calendar-pm-1485-line.html#237
 http://x1.kohaaloha.com/i/nyt-bz14522-after/home-mason-g-k-3-20-x-Koha-Calendar-pm-1485-line.html#280

to test...

1/ add a bunch of single_holidays to your test koha, (my table has 400 holiday rows)
2/ add a loong circ rule for an itemtype (my rule has 140 days)
3/ checkout an item to a user (took me 67 secs)

apply patch...
4/ return item
5/ repeats steps 1..3, (took me 6 secs)

6/ add/change/delete some various single_holidays, via Home->Tools->Calendar
    ensure that your various changes have indeed saved correctly

for extra points...

7/ run tests t/Calendar.t and t/db_dependent/Holidays.t, with all tests pass OK

 sudo  koha-shell -c '  export PERL5LIB=/home/mason/g/k/master ; \
 cd /home/mason/g/k/master ;  perl  t/Calendar.t ; perl  t/db_dependent/Holidays.t  '   testkoha

8/ run QA tool, with all tests pass OK

 sudo  koha-shell -c ' \
export KOHA_CONF=/etc/koha/sites/mayo2/koha-conf.xml \
 export PERL5LIB=/home/mason/g/k/master:/home/mason/qa-test-tools/ ; \
 cd /home/mason/g/k/master ;   perl /home/mason/qa-test-tools/koha-qa.pl  -c 1 ' testkoha

Signed-off-by: Nick Clemens <nick@quecheelibrary.org>

Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Tomas Cohen Arazi <tomascohen@unc.edu.ar>
2015-10-02 11:41:29 -03:00
Jared Camins-Esakov
47a8c10d99 Bug 9209: Skip tests for older DBD::Mock
Because the calendar tests require a more recent version of DBD::Mock
than has been packaged by Debian, it makes sense to skip all the tests
requiring the database when only an older version is present.

Signed-off-by: Liz Rea <liz@catalyst.net.nz>
Works as advertised
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
2012-12-28 20:15:36 -05:00
99410d7ce4 Bug 9209 - Mocked Koha::Calendar tests
Using specific method for populating the internal data structures from Koha::Calendar
has yielded to the non-detection of several bugs. There are also several tests that where
db_dependent which is not always desirable.

I propose the use of DBD::Mock (::Session) for using the actual code used by Koha in production
for testing, mocking the DB queries itselves.

I also took the time to repeat several tests in different syspref configurations (they applied
only to daysMode=Calendar, and now cover all confs).

Notes:
- I used DBD:Mock 1.45 as previous version (1.43, from 12.04) was broken
- Some tests revealed a bug on days_between as I see it... reporting as Bug #9211

Sponsored-by: Universidad Nacional de Córdoba
Signed-off-by: Elliott Davis <elliott@bywatersolutions.com>
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
2012-12-28 20:15:35 -05:00
18b83eedd3 Bug 9142 - Remove the use of subtests
Debian stable's version of Test::More is older than the one I used on my
12.04 dev box, and doesn't support subtests, which I used to avoid side
effects between different test scenarios.

This patch removes that subtest definition.

Signed-off-by: Robin Sheat <robin@catalyst.net.nz>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
All tests pass.
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
2012-11-28 07:19:34 -05:00
7b18e2146c Bug 8800 - useDaysMode=Datedue wrong behaviour (revisited)
useDaysMode=Datedue wasn't used as advertised in the docs. Added
next_open_day and prev_open_day subs to Koha::Calendar and some tests for them.

- Koha::Calendar->addDate was rewritten in a more sane way (also split into
  addHours and addDays for convenience).
- Fixed a bug introduced in Bug 8966 regarding dt truncation and dtSets->contains
- Minor docs typos
- Use the passed Calendar mode or default to 'Calendar' in Koha::Calendar->_mockinit.
- Tests

I'm writing some db-dependent tests for is_holiday, and hopefully for CalcDateDue so any
rewrite/followup doesn't break things.

Regards
To+

Sponsored-by: Universidad Nacional de Córdoba
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Passed-QA-by: Paul Poulain <paul.poulain@biblibre.com>
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
2012-11-22 09:11:19 -05:00
Maxime Pelletier
5c7fae8e89 Bug 8966 Koha::Calendar::is_holiday truncates the date
* Create a local copy of the date instead of calling truncate directly on the date
* Add a test to properly test that the issue is fixed

Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Signed-off-by: Paul Poulain <paul.poulain@biblibre.com>
2012-10-29 18:27:04 +01:00
Chris Cormack
d434be61e2 Bug 8486 - Follow up making the tests db independent
Signed-off-by: Paul Poulain <paul.poulain@biblibre.com>
Makes the test db independant by specifying the date format. Thus, there is no call to ->preference() that retrieve a systempreference
2012-08-01 12:36:56 +02:00
Paul Poulain
54f363c0a6 bug 8486 tiny follow-up, removing ` 2012-07-25 16:55:30 +02:00
Colin Campbell
cd44ef2dc9 Bug 8486 Merge Calendar test files
Moves the tests previously in t/Kalendar.t to t/Calendar.t
and removes the old file.
Note the existing minimal test of C4/Calendar still called in
t/Calendar

Signed-off-by: Paul Poulain <paul.poulain@biblibre.com>
2012-07-25 15:52:24 +02:00
Colin Campbell
3b694b9b1c Bug 8486 Correct calculation of days_between
Thee were errors in the calculation used for days_between
which caused incorrect values to be returned
Added tests to validate calculation

NB Tests still need to be provided for the hourly
calculations
2012-07-25 15:52:16 +02:00
Joe Atzberger
a1fe32d2f8 Total Test Overhaul! Most of these were stubs, and still are.
Input.t was replaced because it tested a now obsolete function.
Input.pm has that function commented out.
Several files were renamed to match their counterparts or
correct misspellingz.

Signed-off-by: Chris Cormack <crc@liblime.com>
Signed-off-by: Joshua Ferraro <jmf@liblime.com>
2007-10-18 16:26:44 -05:00
rangi
77618f43cf Finishing up the last of the tests 2007-06-18 03:20:19 +00:00