This patch adds the ability to set an owner to a fund hierarchy
On editing a fund, if it has children, a new checkbox appears "Set this
owner to all children funds".
If checked, all the fund hierarchy will herit to this owner.
This will facilitate the fund owner modifications.
Test plan:
- Verify that the new checkbox only appears if the fund has at least a child.
- Create a consistent fund hierarchy, something like:
fund1
fund11
fund111
fund12
fund2
fund21
- Try to modify a fund owner without checking the checkbox. Verify the
children have not been modified.
- Try to modify a fund owner with checking the checkbox. Verify all fund
hierarchy has been modified.
Signed-off-by: Frederic Demians <f.demians@tamil.fr>
It works as announced.
Signed-off-by: Katrin Fischer <katrin.fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
The C4::Acquisition module should be exploded in order to add
readability and maintainability to this part of the code.
This patch is a POC, it introduces a new Koha::Acquisition::Order module and put in
it the code from NewOrder and NewOrderItem.
Test plan:
1/ Create an order, modify it, receive it, cancel the receipt.
2/ Launch the prove command on all unit tests modified by this patch and
verify that all pass.
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <katrin.fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Since the basketno parameter is needed to insert an order, it is useless
to return it.
This patch changes the prototype for the C4::Acquisition::NewOrder
subroutine. The return value is now a scalar containing the ordernumber
created.
Test plan:
Verify there is no regression on an acquisition workflow:
1/ Create an order with several items
2/ Modify the order
3/ Receive some items
4/ Cancel the receipt
4/ Receive some items
5/ Receive all remaining items
6/ Cancel the receipt
Signed-off-by: Zeno Tajoli <z.tajoli@cineca.it>
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Patch sponsored by the CCSR ( http://www.ccsr.qc.ca )
This new patch builds on the work of Bug 12164 by allowing the
user to enter a new name (budget_period_description) for the
cloned budget.
A test was added to t/db_dependent/Budgets.t.
Sponsored-by: CCSR
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Works as described, passes tests and QA script.
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Edit: added the sponsored-by line.
On closing a budget (budget period), the user will be presented with an
option to move remaining unspent funds from the previous budget to the
newly created one - adding to the amounts already entered in those
funds.
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
This is the main patch.
On closing a budget period, all unreceived orders are moved from the
old/previous fiscal year into the new fiscal year.
You can rollover funds unused in the previous fiscal year to the new
fiscal year.
This patch set is based on bug 12168 (bugfix) and can be tested on top
of bug 11578 (easier to see the fund structure).
The patch set is cut in 6 main patches:
- Move the budget period clone logic into C4::Budgets
The code is moved from the pl to Budgets.pm and unit tests are provided.
The original code should certainly be buggy since a typo existed.
- On cloning budget period, mark original budget as inactive
Cloning a budget period is already possible in Koha, this patch adds a
checkbox to mark as inactive the original budget. That avoids to edit
the budget and click the "inactive" checkbox. Both do the same action.
- On cloning budget periods, add a "reset all funds" option
Same as before, a new checkbox is added on cloning a budget period. If
you check it, all fund amounts will be set to 0. Otherwise, no change
compared to the existing behavior.
- Close a budget period (budget)
The goal of this patch set is to move unreceived orders from a budget to
another. This patch adds a C4::Budgets::MoveOrders routine which does
this job.
This action is only possible if the fund structure is the same for both
budgets, the budget_code field should be the same.
- On closing budget period, move unspent amount
Unspent amount will be move from the previous budget structure to the
new one.
- Add UI report
This patch only adds a report when closing a budget is done.
Test plan:
Wording: below, budget is a "budget period" and fund is a "budget".
Prerequisite: Having 1 active budget with some funds (with different
levels and different amounts). Order and receive some orders (not all).
1/ Go on the budgets administration page (admin/aqbudgetperiods.pl) and
duplicate the structure of this budget ("Duplicate" link in the
"Actions" column).
2/ Enter start and end date for this budget and mark the original budget
as inactive.
3/ Note that a new budget is created, with the same fund structures (and
same value) and that the old one is marked as inactive (see
admin/aqbudgets.pl page with patches from bug 11578).
4/ Try to close the new budget: it is not possible, there is no
unreceived orders for this budget.
5/ You can close the inactive budget ("Close" link in the "Actions"
column).
6/ Verify the number of "Unreceived orders" is correct and select the
new budget in the budget list. Click on the "Move remaining unspent
funds" if you want to move unspent amounts.
7/ A report view is displayed and show you the ordernumber which have
been impacted (grouped by fund).
8/ Try different configuration, depending on the selected checkboxes.
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
This patch adds a checkbox "reset all funds" (budgets).
If it is checked, the new created budgets (funds) will be reset.
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
This patch adds a checkbox "mark original budget as inactive" (budget
period).
If it is checked, the original budget will be marked as inactive.
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Note the typo InsertInTable "aqcudgets", note sure about the existing
behavior before this patch!
This patch adds a link "Duplicate" in the action list for budget
periods (budgets).
Signed-off-by: Paola Rossi <paola.rossi@cineca.it>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
This patch includes:
- removing the use of subroutines InsertInTable, UpdateInTable, SearchInTable replaced by subroutines of DBIx::Class in the subroutines AddBudget, ModBudget, GetBudgets, AddBudgetPeriods, ModBudgetPeriod and GetBudgetPeriods and admin/aqbudgetperiods.pl
- removing old database fields in OrderFromSubscription.t, Bookseller.t, Budgets.t, Serials.t, Serials_2.t
- improvement of unit tests in t/db_dependent/Budgets.t
- adaptation of calls to the subroutines AddBudget, ModBudget, GetBudgets, AddBudgetPeriods, ModBudgetPeriod and GetBudgetPeriods in order to match with the use of DBIx::Class
Test plan:
1) Execute the UT of all of files wich uses AddBudget, ModBudget, GetBudgets, AddBudgetPeriods, ModBudgetPeriod or GetBudgetPeriods by launching the command :
prove t/Budgets/ t/Budgets.t t/db_dependent/Budgets.t t/db_dependent/Acquisition.t t/db_dependent/Acquisition/ t/db_dependent/Bookseller.t t/db_dependent/Serials.t t/db_dependent/Serials_2.t
2) The result has to be a success :
t/Budgets/CanUserModifyBudget.t ........................... ok
t/Budgets/CanUserUseBudget.t .............................. ok
t/Budgets.t ............................................... ok
t/db_dependent/Budgets.t .................................. ok
t/db_dependent/Acquisition.t .............................. ok
t/db_dependent/Acquisition/GetBasketsInfosByBookseller.t .. ok
t/db_dependent/Acquisition/GetOrdersByBiblionumber.t ...... ok
t/db_dependent/Acquisition/Invoices.t ..................... ok
t/db_dependent/Acquisition/OrderFromSubscription.t ........ ok
t/db_dependent/Acquisition/TransferOrder.t ................ 1/11 # Transfering order to basket2
t/db_dependent/Acquisition/TransferOrder.t ................ ok
t/db_dependent/Acquisition/close_reopen_basket.t .......... ok
t/db_dependent/Bookseller.t ............................... 16/72 WARNING: GetBooksellerWithLateOrders is called with a negative value at /home/yohann/koha/C4/Bookseller.pm line 135.
t/db_dependent/Bookseller.t ............................... ok
t/db_dependent/Serials.t .................................. ok
t/db_dependent/Serials_2.t ................................ ok
All tests successful.
Files=14, Tests=571, 22 wallclock secs ( 0.17 usr 0.03 sys + 20.26 cusr 1.10 csys = 21.56 CPU)
Result: PASS
3) Go on the page admin/aqbudgetperiods.pl : Koha Administration > Budgets
4) Click on the button "New Budget" and record a new budget with a "nonzero amount" and "make budget active"
5) Click on the button "New Budget" and record another budget without "make budget active"
6) Verify there is the firt budget displayed in "Active budgets" and the second budget in "Inactive budgets"
7) Edit a budget and verify the new values are updated
8) Click on the budget active name in order to go on the page admin/aqbudgets.pl
9) Click on the button "New fund for ..." and record a new fund
10) Click on the button "Edit" then "Duplicate budget ..." in order to duplicate the budget
11) Verify there are two budgets in "Active Budgets" and one in "Inactive Budgets"
12) Click on "Funds" in the menu and verify there are two identical funds and each is associated to a different budget.
Signed-off-by: Chris Cormack <chrisc@catalyst.net.nz>
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Tomas Cohen Arazi <tomascohen@gmail.com>
Test plan:
prove t/db_dependent/Budgets.t
Note: This addition may sound overkill but I found this bug developing
bug 12164 and I will reuse all of that.
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
- fix unit tests (use a transaction).
- add 3 tabs on the page in order to be more understandable.
- fix a warn in logs
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
Signed-off-by: Kyle M Hall <kyle@bywatersolutions.com>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
This patch moves the GetBudgetByOrderNumber() test from
Budgets.t to Acquisition.t, thereby making it easier to
test without doing a direct SQL insert into the aqorders table.
To test:
[1] Verify that prove -v t/db_dependent/Budgets.t passes
[2] Verify that prove -v t/db_dependent/Acquisition.t passes
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
This patch also temporarily removes any existing
budgets to avoid issues where tests can fail if there
is already an active budget in the database.
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
This adds a test case for the new default sort
order for GetBudgets().
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
Signed-off-by: Jonathan Druart <jonathan.druart@biblibre.com>
Signed-off-by: Galen Charlton <gmc@esilibrary.com>
New unit tests for 4 routines:
- C4::Serials::subscriptionCurrentlyOnOrder
- C4::Acquisition::GetLastOrderNotReceivedFromSubscriptionid
- C4::Acquisition::GetLastOrderReceivedFromSubscriptionid
- C4::Budgets::GetBudgetName
Signed-off-by: Chris Cormack <chris@bigballofwax.co.nz>
Signed-off-by: Katrin Fischer <Katrin.Fischer.83@web.de>
Fixed a tab in t/db/dependent/Budgets.t
All tests, new db_dependent tests and QA script pass. Thx Jonathan!
Signed-off-by: Jared Camins-Esakov <jcamins@cpbibliography.com>
* remove test that was adding a second active budget period,
which was throwing off later tests
* updated to reflect current API
Signed-off-by: Galen Charlton <gmcharlt@gmail.com>
This big patch, fix xhtml code, and user interface.
It Delete the term of budget period and use it as "Root Budget".
It add improvment on UI, adding tooltip, and table tree.